Kangasala, Finland · Tampere Region

A data center site, ready to build.

Six hectares zoned and ready to build, with roughly 30 hectares more to develop. 1.3 km from Fingrid’s substation with access to up to 500 MW, a detailed plan already in force, and a building permit application pending.

6 ha
Zoned, ready to build
30 ha
For further development
500 MW
Grid capacity · 400 kV
1.3 km
To Fingrid substation
The Site

Everything a data center needs — already in place.

Kangasala offers a fast start. The groundwork is done: land secured, grid capacity within reach, and the detailed plan for the first 6 hectares in force.

6 + 30 ha
Room to scale
6 ha zoned and ready to build across Phases I and II, plus roughly 30 ha for further development.
500 MW · 400 kV
Power at the fence
Fingrid’s 400 kV substation is 1.3 km away, with an Elenia power line running alongside the plot.
Asemakaava
Plan in force
6 ha is zoned, covering Phases I and II. Phase I carries 12,000 m² of building rights, with a building permit application pending.
Single developer
One partner for the whole area
The whole area is developed as a single project by an experienced developer — fewer negotiations, a faster start.
Renewables
Renewable by design
On-site renewable energy generation.
District heat
Waste heat recovered
Data center waste heat captured and used in Kangasala’s district heating network.

Map of the DataPark Kangasala site. The Phase I and II plots, 6 hectares in total, are zoned and ready to build; the larger Phase III area alongside them holds roughly 30 hectares for further development. Fingrid's 400 kV substation lies 1.3 km to the north-west with up to 500 MW available, Elenia's substation lies just to the south, and both the 400 kV and 110 kV lines run past the site.

Location

In the heart of the Tampere region.

Kangasala sits at the edge of the Tampere metropolitan area, with direct road connections and a strong industrial base.

14 km
To central Tampere
Tampere region
One of Finland’s fastest-growing economic areas
Road 12 / 339
Direct motorway and logistics access
The Developer

UM Kiinteistöt — building regions for the long term.

A family-owned project, real-estate and area-development company specialising in land ownership and long-term area development. Lifecycle thinking and energy efficiency are at the core of everything the company does.

ReliabilityInnovationContinuous developmentCollaboration
Read more
100 ha
Land under development
55 ha
Property developed
65,000
Business premises built
10 yrs
Of development history
Track Record

Active area development projects.

Beyond Kangasala, UM Kiinteistöt currently has two active area development projects — GreenPark, a business park in Lempäälä, and Sundsberg, a mixed residential development in Kirkkonummi.

GreenPark
GreenParkLempäälä
A large-scale, sustainability-focused business park in Lempäälä, launched in 2026.
Business parkLaunched 2026
Read more
Sundsberg
SundsbergKirkkonummi
A major mixed residential development in the Helsinki metropolitan area.
Mixed residential20+ ha
Contact

Let’s talk.

Reach out to the UM Kiinteistöt project team to request the teaser or arrange a site visit.

Liza Ageeva
Project Development Director
+358 43 826 7610
Antti Uusi-Marttila
Project Development Manager
+358 44 016 0056